Completed | Bridge KAKUOZAN — OPEN HOUSE & RECEPTION | October 24–26, 2026
Updated: 32 minutes ago

Bridge KAKUOZAN | OPEN HOUSE & RECEPTION
FULL POWER STUDIO New Office Open House
FULL POWER STUDIO has completed its new headquarters, Bridge KAKUOZAN, along the approach to Nittaiji Temple in Kakuozan, Nagoya, and relocated its office to the new building.
The building combines three different functions: THE Rock, an alternative space for exhibitions, creative activities, and dialogue on the first floor; the architectural design studio on the second floor; and a residence on the third floor.
These distinct activities coexist within a single building, allowing their presence to be felt across different spaces. Prior to its completion, the project was selected for SD Review 2025, an annual architectural review and exhibition in Japan.
To mark the completion of the building, we held a three-day open house from October 24 (Sat) to October 26 (Mon), 2026.
The program included approximately 45-minute guided tours led by the architects, introducing the design intentions and construction process.
In May 2026, FULL POWER STUDIO also celebrated its 10th anniversary. To reflect on a decade of architectural practice, a small exhibition at THE Rock on the first floor presented a selection of projects developed over the past ten years.
On the evening of October 24, a reception was held to express our gratitude to everyone who has supported our work.
The reception began with a talk session featuring four collaborators who contributed to the building's construction, including the development of new construction methods and approaches to making.
The open house and reception were both free of charge and required advance registration.
We were delighted to welcome both those who have supported us over the years and those visiting our work for the first time.
Noriyuki Furuhata & Chigusa Sakai
FULL POWER STUDIO
Building Information
Project Name: Bridge KAKUOZAN
Architects: Noriyuki Furuhata and Chigusa Sakai, FULL POWER STUDIO
Structure: Hybrid reinforced concrete and timber construction
Scale: Three stories above ground (total floor area: approximately 240 m²)
Building Use: Residence and office
1F: THE Rock — Alternative Space for Creatives
2F: FULL POWER STUDIO — Architectural Design Office
3F: Private Residence
Recognition: Selected for SD Review 2025
Open House (Advance Registration Required)
Dates: October 24 (Sat), 25 (Sun), and 26 (Mon), 2026
The open house was organized as guided tours led by the architects, each lasting approximately 45 minutes.
*Tour schedules were provided through the event ticketing page.
Reception Party (Advance Registration Required)
To celebrate the opening of the new headquarters and the 10th anniversary of FULL POWER STUDIO, we hosted a small reception with refreshments and drinks.
Date: Saturday, October 24, 2026
Time: 16:00–18:00
Venue: THE Rock, 1F, Bridge KAKUOZAN
16:00 — Talk Session: Craftsmanship and Construction
Following the Talk Session — Reception
Light refreshments and drinks were provided.
Talk Session Participants
Nobuhiko Yasui
General Manager, Maeda Komuten Co., Ltd.
On-site construction management
Hiroki Suzuki
Director, Executive Officer and General Manager of Sales Promotion Division, Tokai Concrete Industry Co., Ltd.
Fabrication and construction of the reinforced-concrete rock forms
Ryusuke Imai
Managing Director, Suiho Co., Ltd.
Fabrication and construction of the timber-log exterior walls and timber framework
Tokujiro Kato
President and Representative Director, Yatomi Sawmill Co., Ltd.
Sourcing, milling, and installation of large timber
Noriyuki Furuhata & Chigusa Sakai
FULL POWER STUDIO
Architectural design
Separate registration was required for the reception and the open house.
Registration closed once capacity was reached.
Venue & Access
Bridge KAKUOZAN
Bridge KAKUOZAN
1-48-9 Sanmoncho, Chikusa-ku, Nagoya, Aichi 464-0064, Japan
Approximately a 3-minute walk from Exit 1 of Kakuozan Station on the Nagoya Municipal Subway Higashiyama Line.
There is no dedicated parking at the venue. Visitors were asked to use public transportation or nearby paid parking facilities.
Registration Information (Event Completed)
Both the open house and reception were free of charge and required advance registration through Peatix.
Each participant was required to register individually, even when attending as part of a group.
Registration was on a first-come, first-served basis and closed once capacity was reached.
Check-in began 10 minutes before each session on the first floor of the new building.
Separate tickets were required for the open house and reception party.



Comments