top of page

Exhibition Workshop Pop-up Talk

PhotoStudio Community & more

  • Instagram

Completed | Bridge KAKUOZAN — OPEN HOUSE & RECEPTION | October 24–26, 2026

Oct 24
3 min read

Updated: 32 minutes ago

Bridge KAKUOZAN

Bridge KAKUOZAN | OPEN HOUSE & RECEPTION

FULL POWER STUDIO New Office Open House


FULL POWER STUDIO has completed its new headquarters, Bridge KAKUOZAN, along the approach to Nittaiji Temple in Kakuozan, Nagoya, and relocated its office to the new building.


The building combines three different functions: THE Rock, an alternative space for exhibitions, creative activities, and dialogue on the first floor; the architectural design studio on the second floor; and a residence on the third floor.


These distinct activities coexist within a single building, allowing their presence to be felt across different spaces. Prior to its completion, the project was selected for SD Review 2025, an annual architectural review and exhibition in Japan.


To mark the completion of the building, we held a three-day open house from October 24 (Sat) to October 26 (Mon), 2026.


The program included approximately 45-minute guided tours led by the architects, introducing the design intentions and construction process.


In May 2026, FULL POWER STUDIO also celebrated its 10th anniversary. To reflect on a decade of architectural practice, a small exhibition at THE Rock on the first floor presented a selection of projects developed over the past ten years.


On the evening of October 24, a reception was held to express our gratitude to everyone who has supported our work.


The reception began with a talk session featuring four collaborators who contributed to the building's construction, including the development of new construction methods and approaches to making.


The open house and reception were both free of charge and required advance registration.


We were delighted to welcome both those who have supported us over the years and those visiting our work for the first time.


Noriyuki Furuhata & Chigusa Sakai

FULL POWER STUDIO


Building Information

  • Project Name: Bridge KAKUOZAN

  • Architects: Noriyuki Furuhata and Chigusa Sakai, FULL POWER STUDIO

  • Structure: Hybrid reinforced concrete and timber construction

  • Scale: Three stories above ground (total floor area: approximately 240 m²)

  • Building Use: Residence and office

    • 1F: THE Rock — Alternative Space for Creatives

    • 2F: FULL POWER STUDIO — Architectural Design Office

    • 3F: Private Residence

  • Recognition: Selected for SD Review 2025


Open House (Advance Registration Required)

  • Dates: October 24 (Sat), 25 (Sun), and 26 (Mon), 2026

  • The open house was organized as guided tours led by the architects, each lasting approximately 45 minutes.

    *Tour schedules were provided through the event ticketing page.


Reception Party (Advance Registration Required)

To celebrate the opening of the new headquarters and the 10th anniversary of FULL POWER STUDIO, we hosted a small reception with refreshments and drinks.

  • Date: Saturday, October 24, 2026

  • Time: 16:00–18:00

  • Venue: THE Rock, 1F, Bridge KAKUOZAN

  • 16:00 — Talk Session: Craftsmanship and Construction

  • Following the Talk Session — Reception

  • Light refreshments and drinks were provided.

  • Talk Session Participants

    • Nobuhiko Yasui

      General Manager, Maeda Komuten Co., Ltd.

      On-site construction management

    • Hiroki Suzuki

      Director, Executive Officer and General Manager of Sales Promotion Division, Tokai Concrete Industry Co., Ltd.

      Fabrication and construction of the reinforced-concrete rock forms

    • Ryusuke Imai

      Managing Director, Suiho Co., Ltd.

      Fabrication and construction of the timber-log exterior walls and timber framework

    • Tokujiro Kato

      President and Representative Director, Yatomi Sawmill Co., Ltd.

      Sourcing, milling, and installation of large timber

    • Noriyuki Furuhata & Chigusa Sakai

      FULL POWER STUDIO

      Architectural design

  • Separate registration was required for the reception and the open house.

  • Registration closed once capacity was reached.


Venue & Access

Bridge KAKUOZAN

Bridge KAKUOZAN

1-48-9 Sanmoncho, Chikusa-ku, Nagoya, Aichi 464-0064, Japan

  • Approximately a 3-minute walk from Exit 1 of Kakuozan Station on the Nagoya Municipal Subway Higashiyama Line.

  • There is no dedicated parking at the venue. Visitors were asked to use public transportation or nearby paid parking facilities.


Registration Information (Event Completed)

Both the open house and reception were free of charge and required advance registration through Peatix.

  • Each participant was required to register individually, even when attending as part of a group.

  • Registration was on a first-come, first-served basis and closed once capacity was reached.

  • Check-in began 10 minutes before each session on the first floor of the new building.

  • Separate tickets were required for the open house and reception party.


Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page